Completed projects
AllLong-span structuresHigh-rise buildingsCivil projectsCultural heritage facilitiesEnergy power facilitiesOlympic projectsPotentially hazardous facilities
29.05.2023 | Primorsky OceanariumOn September 23, 2022, the BAZIS company commissioned the SMIS, SMIK, SMS systems of the Primorsky Oceanarium, a branch of the NSCMB FEB RAS, with the connection of the SMIS system to the PTK EDDS of Vladivostok Primorsky Oceanarium (a scientific and educational complex, a branch of the National Scientific... | |
07.12.2021 | PJSC "Togliattiazot"IC GOChS "BAZIS" for the object of PJSC "Togliattiazot" performed Supply of equipment and materials for the implementation of SMIS at the facility "Installation for the production of urea with a capacity of 2200 tons per day" (PJSC "Togliattiazot"). Customer: PJSC "Togliattiazot" PJSC TOAZ (Togliattiazot) is one of the city-forming... | |
23.09.2021 | Residential complex "I LOVE"ITs GOChS "BASIS" for the object Moscow, Bochkova st., Ow. 11а, bldg. 1 performed the following works: • adjustment of the Working Documentation for SMIS and SMIK; • complete delivery of products and materials to the Facility with loading and unloading operations and to the place of Work; • general... | |
10.09.2021 | Universal sports complex in Khanty-MansiyskITC GOChS "BAZIS" for the USC facility in Khanty-Mansiysk completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS, SMIK, SUKS systems at the "Universal sports complex in Khanty-Mansiysk" Customer: PJSC Rostelecom The universal sports complex has a total area of almost 13... | |
12.07.2021 | Construction of CCGT-TPP for PJSC "Nizhnekamskneftekhim"IC GOChS "BAZIS" for the facility Construction of CCGT-TPP for PJSC "Nizhnekamskneftekhim" was completed Supply of equipment and materials, carried out construction and installation work at a new CCGT-TPP for the production of PJSC "Nizhnekamskneftekhim" Customer: PJSC "Nizhnekamskneftekhim" CCGT-TPP with a capacity of 495 MW - a project of PJSC... | |
14.04.2021 | Business center "Zemelnyi 7/2"ITs GOChS "BAZIS" for the object 1-st Land lane, vl. 7/2, p. 1-2 performed the following works: • development of Working documentation for SMIS, SMIK and SUKS; • complete delivery of products and materials to the Facility with loading and unloading operations and to the place of Work; • general... | |
12.05.2020 | Multifunctional complex "IQ-quarter"IC GOChS "BASIS" for the object of MIBC "Moscow-City", section 11, performed the following works: • development of Working documentation for SMIS, SMIK and SUKS; • complete delivery of products and materials to the Facility with loading and unloading operations and to the place of Work; • general construction and... | |
23.12.2019 | Boiler room in VladivostokIC GOChS "BAZIS" for the Boiler room facility in Vladivostok performed A full range of works, including design, construction and installation, start-up and commissioning and commissioning of the SMIS, SMIK system at the facility "Complex development of the territory in the area of 100 Russkaya St. in Vladivostok, 1st stage... | |
15.07.2019 | Multifunctional complex "Mosfilmovskaya" with underground parkingIC GOChS "BAZIS" performed the following works for the object "Multifunctional complex with underground parking": • adjustment of the Working Documentation for SMIS and SMIK; • complete delivery of products and materials to the Facility with loading and unloading operations and to the place of Work; • general construction and... | |
29.01.2019 | Vysotsk portITC GOChS "BAZIS" for the object Port of Vysotsk, power unit No. 1 completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS, SMIK, SUKS systems at the facility "Terminal for the production and transshipment of liquefied natural gas in the port of... |