Completed projects
AllLong-span structuresHigh-rise buildingsCivil projectsCultural heritage facilitiesEnergy power facilitiesOlympic projectsPotentially hazardous facilities
05.09.2024 | Amur Mining and Chemical Combine LLCOn July 18, 2024, JSC Engineering Center GOChS Basis successfully completed factory acceptance tests of the SMIS equipment, including the SMIS subsystem of the facility: Infrastructure of the off-site facilities (buildings, cable networks) of the Amur Gas Chemical Plant. (SIBUR). The tests were conducted from July 15 to July 19... | |
15.04.2024 | Refueling complex at Pulkovo International AirportThe delivery of a complex of SMIS technical equipment, construction and installation work was completed. The structured monitoring and control system for engineering systems of buildings and structures (SMIS) is designed for automatic monitoring of technological processes, engineering safety and life support systems, building structures of buildings and structures and... | |
13.02.2024 | PJSC TogliattiazotOn June 20, 2023, the EC GOES "BASIS" completed a full range of work to commission the SMIS of the facility "Urea production plant with a capacity of 2200 tons per day" for PJSC Togliattiazot, including construction, installation, commissioning and commissioning . Customer: PJSC Togliattiazot PJSC TOAZ (Togliattiazot) is one... | |
07.12.2021 | PJSC "Togliattiazot"IC GOChS "BAZIS" for the object of PJSC "Togliattiazot" performed Supply of equipment and materials for the implementation of SMIS at the facility "Installation for the production of urea with a capacity of 2200 tons per day" (PJSC "Togliattiazot"). Customer: PJSC "Togliattiazot" PJSC TOAZ (Togliattiazot) is one of the city-forming... | |
10.09.2021 | Universal sports complex in Khanty-MansiyskITC GOChS "BAZIS" for the USC facility in Khanty-Mansiysk completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS, SMIK, SUKS systems at the "Universal sports complex in Khanty-Mansiysk" Customer: PJSC Rostelecom The universal sports complex has a total area of almost 13... | |
06.12.2018 | Catalyst production with a capacity of 3000 tons per yearIC GOChS "BAZIS" for the object. A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS system at the "Structured system for monitoring and control of engineering systems of buildings and structures SMIS of oligomers and glycols" PJSC "Nizhnekamskneftekhim". SMIS production of KDI-M catalyst... | |
23.11.2018 | Nizhnekamskneftekhim Isoprene Monomer PlantIC GOChS "BAZIS" for the Nizhnekamskneftekhim facility Isoprene-monomer plant completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS system at the facility "Technical re-equipment of isoprene production at the IM plant" Customer: PJSC "Nizhnekamskneftekhim" The main types of manufactured products: isoprene, methyl... | |
04.10.2017 | Launch complex of SC "Angara" of the "Vostochny" cosmodromeIC GOChS "BAZIS" for the "Angara" launch complex, site 1A of the "Vostochny" cosmodrome performed: - development of STU SMIS; - development of design documentation for SMIS. Customer: JSC "31 GPISS" The creation of the Angara CSC is a task of special state importance. The commissioning of this rocket complex... | |
23.01.2017 | Launch complex of "Soyuz-2" space rocket at Spaceport "Vostochnyi"Engineering Center GOChS "BASIS" performed the following works for the facility "Launch complex of "Soyuz-2" space rocket at Spaceport "Vostochnyi": - SMIS development of the TSA; - SMIS design documentation; - SMIS development of working documentation; - Supply of equipment; - Construction and installation work; - Commissioning work. Customer: OJSC... | |
19.01.2017 | SMES for Air Separation Installation PL4HN in Toliatti townEngineering Center «BASIS» performed the following works on SMES* for the facility «Air Separation Installation PL4HN in Toliatti town»: - delivery of equipment and materials;- construction and erection works;- commissioning works with connection to Integrated Dispatching Center of Toliatti town. Customer: OJSC «Proxair Azot Toliatti». Air Separation Installation PL4HN in... |