Construction of generating facilities of the South Yakutsk Thermal Power Plant
05.09.2024 |

Construction of generating facilities of the South Yakutsk Thermal Power Plant

On July 22, 2024, JSC Engineering Center for Civil Defense and Emergencies BASIS developed design documentation for a structured monitoring and control system for engineering systems of buildings and structures (SMIS) for the construction project - "Construction of generating facilities of the South Yakutskaya TPP". The new TPP will help...
"Polar GTPP"
13.02.2024 |

"Polar GTPP"

On August 18, 2023, the BAZIS company completed the full range of work to put into operation the Structured System for Monitoring and Control of Engineering Systems (SMIS) at the Polar GTPP facility. The delivery of a complex of SMIS technical equipment, installation supervision and commissioning work was carried out...
Rybinskaya HPP
29.05.2023 |

Rybinskaya HPP

CJSC "Engineering Center GOChS BAZIS" for the facility of PJSC "RusHydro" - "Rybinskaya HPP", power unit No. 5 performed a full range of commissioning works, including design, construction and installation, commissioning and commissioning of the Structured Monitoring System engineering systems (SMIS). Customer: PJSC Power Machines The Rybinsk hydroelectric power station...
Boguchanskaya HPP
29.05.2023 |

Boguchanskaya HPP

Completion of work on the SMIK of the Boguchanskaya HPP December 2022 Work was completed to put into operation the System for monitoring changes in the state of engineering (supporting) structures (SMIK) of the Boguchanskaya HPP. In 2022, the previously developed working documentation for the subsystem for monitoring engineering (supporting...
Construction of CCGT-TPP for PJSC "Nizhnekamskneftekhim"
12.07.2021 |

Construction of CCGT-TPP for PJSC "Nizhnekamskneftekhim"

IC GOChS "BAZIS" for the facility Construction of CCGT-TPP for PJSC "Nizhnekamskneftekhim" was completed Supply of equipment and materials, carried out construction and installation work at a new CCGT-TPP for the production of PJSC "Nizhnekamskneftekhim" Customer: PJSC "Nizhnekamskneftekhim" CCGT-TPP with a capacity of 495 MW - a project of PJSC...
Boiler room in Vladivostok
23.12.2019 |

Boiler room in Vladivostok

IC GOChS "BAZIS" for the Boiler room facility in Vladivostok performed A full range of works, including design, construction and installation, start-up and commissioning and commissioning of the SMIS, SMIK system at the facility "Complex development of the territory in the area of 100 Russkaya St. in Vladivostok, 1st stage...
Vysotsk port
29.01.2019 |

Vysotsk port

ITC GOChS "BAZIS" for the object Port of Vysotsk, power unit No. 1 completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS, SMIK, SUKS systems at the facility "Terminal for the production and transshipment of liquefied natural gas in the port of...
Nizhnekamsk CHP
23.11.2018 |

Nizhnekamsk CHP

IC GOChS "BAZIS" for the facility Nizhnekamsk CHP completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS system at the facility "Construction of a pipeline of initial (river) water No. 1, 2 of Nizhnekamsk CHPP". Customer: JSC "TGK-16" - "Nizhnekamsk CHPP-1" Nizhnekamsk...
The first power unit of the Belarusian NPP
15.10.2018 |

The first power unit of the Belarusian NPP

IC GOChS "BAZIS" for the object of the Belarusian NPP, power unit No. 1 completed • supply of equipment and materials to the object Customer: Joint Stock Company "Atomstroyexport" (JSC ASE) The Belarusian NPP is the first nuclear power plant in Belarus, of the AES-2006 type. It is located at...
Diaghilevskaya CHPP
20.09.2018 |

Diaghilevskaya CHPP

IC GOChS "BAZIS" for the facility Diaghilevskaya CHPP completed A full range of works, including design, construction and installation, commissioning and commissioning of the SMIS, SMIK, SUKS systems at the facility "Expansion of the Diaghilevskaya CHPP. Construction of a 115 MW CCGT unit, including the existing part of the Diaghilevskaya...