Completed projects
AllLong-span structuresHigh-rise buildingsCivil projectsCultural heritage facilitiesEnergy power facilitiesOlympic projectsPotentially hazardous facilities
![]() | 17.11.2014 | Combined Complex for Cross-Country Skiing and Biathlon Competition. The Second Construction Phase. Cottage Village.Combined Complex for Cross-Country Skiing and Biathlon Competition. The Second Construction Phase. Cottage Village was equipped with SMES* system. The Combined Complex is designed for competitions in cross-country skiing and biathlon, has the capacity of 16,000 viewers for each competition, includes Olympic mountain village (1100 seats), access road, construction of... |
![]() | 17.11.2014 | Administrative and Commercial Complex, Moscow, Dmitrov highway, 1Administrative and Commercial Complex, Moscow, Dmitrov highway, 1, with an underground parking was equipped with SMES*. The Complex is an administrative building of А-class consisting of 2 main high-rise elements: 47 floors a and 5, 6-floors stylobate. The underground part of the building consists of 6 levels: a ground level... |
![]() | 17.11.2014 | Reconstruction of Non-residential Building, Moscow, Sofia Embankment, 30, building 2Reconstruction of Non-residential building. Adaptation of the building for a Hotel-Apartment within the program of special activities aimed at preservation and regeneration of historical construction environment of cultural heritage at the address: Moscow, Central District Yakimanka district, Sofia Embankment, 30, Building 2. Characteristics of the facility to-be-equipped with SMES*: Lot... |
![]() | 17.11.2014 | Hotel Apartments, Moscow, 2nd Syromyatnicheskiy lane, 4/14, buildings 1, 2; Melnitsky lane, 12, building 1Hotel Apartments at 4/14, 2nd Syromyatnicheskiy lane and Melnitsky lane, 12, in Moscow were equipped with SMES* . The entrance to the underground car park, of capacity of 67 cars, was organized from the yard side, along ring double-track ramp, at the normative 15-meter distance from the windows of the... |
![]() | 17.11.2014 | Tunnel under Navigation Pass in Saint Petersburg«The Set of flood-protection facilities of Saint Petersburg. Tunnel under Navigation Pass». Highway tunnel is set under the Navigation Pass and is a part of highway. Total length of the tunnel is 1907 m, including closed part – 1195.0 m, and 2 ramp parts, 356 m each. In its transverse... |



.jpeg)
