Completed projects

Boguchanskaya Hydro Electric Power Plant
23.01.2017 |

Boguchanskaya Hydro Electric Power Plant

Engineering Center "BASIS" for the facility "Boguchanskaya Hydro Electric Power Plant" performed the following works: НМС СМИС - SMES construction and technical specifications;- PM GOCHS development;- SMES working documents development;- delivery of equipment;- construction and erection works;- commissioning works. Customers: PAO "Boguchanskaya Hydro Electric Power Plant", OJSC "STB" Boguchanskaya Hydro...
Yakutskaya State District Power Plant-2
23.01.2017 |

Yakutskaya State District Power Plant-2

Engineering Center "BASIS" perfomed the following works for the facility "Yakutskaya State District Power Plant-2":- - SMES working documents development,- Delivery of equipment,- Construction and erection works. Customer: АО "TEC Mosenergo" The station supplies electricity in 9 districts of the Central energy district of Yakutia, providing customers with generate power...
Power Unit PGU-420Т TPS-20 - subsidiary of PAO «Mosenergo»
19.01.2017 |

Power Unit PGU-420Т TPS-20 - subsidiary of PAO «Mosenergo»

Engineering Center «BASIS» performed the following works on SMES* of the facility Power Unit PGU-420Т TPS-20 - subsidiary of PAO «Mosenergo»: - SMES working documents development; - delivery of equipment and materials; - construction and erection works; - commissioning works. Customer: "TEC Mosenergo" Power Unit PGU-420Т is located in the...
Construction of a Power-Generating Unit PGU of 220 tons, at Thermal Power Plant-12
17.12.2014 |

Construction of a Power-Generating Unit PGU of 220 tons, at Thermal Power Plant-12

Engineering Center GOCHS "BASIS" carried out the following works on SMES* of the facility "Power-Generating Unit PGU of 220 tons, at Thermal Power Plant-12": - SMES engineering design and working documents development;- supply of equipment and materials,- construction and installation,- commissioning works. Customer: АО "ТEC Mosenergo". PGU-220T provides a combined...
Construction of a Power-Generating Unit PGU of 420 tons, at Thermal Power Plant-16
17.12.2014 |

Construction of a Power-Generating Unit PGU of 420 tons, at Thermal Power Plant-16

Engineering Center GOCHS "BASIS" carried out the following works on SMES of the facility "ower-Generating Unit PGU of 420 tons, at Thermal Power Plant-16": - SMES engineering design and working documents; - supply of equipment and materials; - construction and erection works; - commissioning works. Customer: АО "TEC Mosenergo" Power-generating...
The Territory of Serov State District Power Station. Сonstruction of Power Generation Unit PGU-420 with Release of the First Starting Complex - Art. No. 9, 10.
11.12.2014 |

The Territory of Serov State District Power Station. Сonstruction of Power Generation Unit PGU-420 with Release of the First Starting Complex - Art. No. 9, 10.

Engineering Center GOChS "BASIS" performed the following works on SMES* of the facility "Serov State District Power Station. Сonstruction of Power Generation Unit PGU-420 with Release of the First Starting Complex - Art. No. 9,10" : - Development of SMES working documents;- Delivery of equipment and materials; - Construction and...
Power Unit №4 of Cherepovets State District Power Station based combined-cycle technology, Block №4 (PGU-420)
10.12.2014 |

Power Unit №4 of Cherepovets State District Power Station based combined-cycle technology, Block №4 (PGU-420)

Automatic unit process control system and other equipment, communication devices providing regular work of the installation should be based on «SPPA-T3000» (SIEMENS AG). Construction of PGU-400 MW is planned to be done on the free territory of the reserve branch of "OGK-6" of Cherepovets State District Power Station industrial site...
Enrichment Plant "Matyushinskaya", LLC "Cut" Berezovsky "
08.12.2014 |

Enrichment Plant "Matyushinskaya", LLC "Cut" Berezovsky "

ИЦ ГОЧС «БАЗИС» для объекта "Обогатительная фабрика "Матюшинская" ООО "Разрез «Березовский" выполнил следующие виды работ: поставку и пуско-наладку ПТК СМИС/СМИК Заказчик: ЗАО НИПИ "Кузбасспроект" Площадка для размещения фабрики расположена в Прокопьевском районе Кемеровской области. На обогатительной фабрике происходит обогащение коксующихся углей марок «ОС» и «КС» и энергетических углей марок «Т...
Abakan Thermal Power Station
08.12.2014 |

Abakan Thermal Power Station

A new Power Unit of Abakan Thermal Power Station is going to be equipped with SMES* System. The area of the construction site is 963,372 sq.m. Buildings and facilities that make up the project: "New Unit of Abakan TPS": the main building from the side of temporary end of the...
Adler Thermal Power Plant
28.11.2014 |

Adler Thermal Power Plant

Adler Thermal Power Plant (TPP) based on 2 energy power units PGU-180Т is meant to provide the Olympic objects located in Imeritinskyi lowland and developing facilities of Sochi as a mountain resourt with thermal and electric energy. General Information about the Object: The land lot for construction of Adler Thermal...