17.12.2014
Construction of a Power-Generating Unit PGU of 420 tons, at Thermal Power Plant-16
Engineering Center GOCHS "BASIS" carried out the following works on SMES of the facility "ower-Generating Unit PGU of 420 tons, at Thermal Power Plant-16":
- SMES engineering design and working documents;
- supply of equipment and materials;
- construction and erection works;
- commissioning works.
Customer: АО "TEC Mosenergo"
Power-generating unit №8 PGU-420T provides a combined production of electricity and heat for the consumers of the Moscow region.
*SMES is Structured System of Control and Monitoring Engineering Systems of Buildings and Facilities.