Engineering center
GOChS «BASIS»
17.12.2014

Construction of a Power-Generating Unit PGU of 420 tons, at Thermal Power Plant-16

Engineering Center GOCHS "BASIS" carried out the following works on SMES of the facility "ower-Generating Unit PGU of 420 tons, at Thermal Power Plant-16":

- SMES engineering design and working documents;

- supply of equipment and materials;

- construction and erection works;

- commissioning works.


Customer: АО "TEC Mosenergo"


Power-generating unit №8 PGU-420T provides a combined production of electricity and heat for the consumers of the Moscow region.

*SMES is Structured System of Control and Monitoring Engineering Systems of Buildings and Facilities.