Engineering center
GOChS «BASIS»
29.05.2023

Boguchanskaya HPP

Completion of work on the SMIK of the Boguchanskaya HPP

December 2022 Work was completed to put into operation the System for monitoring changes in the state of engineering (supporting) structures (SMIK) of the Boguchanskaya HPP.

In 2022, the previously developed working documentation for the subsystem for monitoring engineering (supporting) structures (SMIK) was corrected, the software and hardware module for interfacing the SMIS server with the automated system for seismometric control of the main structures of the Boguchanskaya HPP (ASSK BoHPP) PTMS SMIS ASSK BAZIS Intellect was adjusted, the Software module was adjusted ARM SMIS display and signaling according to ASSK and ASDC PM messages ARM SMIS OS BAZIS-Intellect. As part of the commissioning work, the software and hardware interface module for the SMIS server with the automated diagnostic control system for the safety of hydraulic structures of the Boguchanskaya HPP (ASDK GTS BoHPP) PTMS SMIS ASDC BAZIS-Intellect was configured and adjusted. Acceptance tests have been carried out. The system has been put into operation.