Moscow State Conservatory after Peter Tchaikovsky
28.11.2014 |

Moscow State Conservatory after Peter Tchaikovsky

SMES* equipment is going to be installed to the facility "Restoration, reconstruction, partial new construction and adaptation to modern functional and engineering requirements of the Complex of buildings of the Moscow State Conservatory after Peter Tchaikovsky at the following addresses: Moscow, Srednii Kislovskiy lane, 3, bld. 1, 1a, 2, 3...
Office Building of Organizing Committee of the Olympic Games in Imereti Lowland, Sochi
28.11.2014 |

Office Building of Organizing Committee of the Olympic Games in Imereti Lowland, Sochi

The object "Office building in Imereti lowland for the personnel of independent non-profit organization "Organizing Committee of the XXII Olympic Winter Games and XI Paralympic Winter Games - 2014 in Sochi" (project design, survey and construction works) was equipped with SMES* equipment. The plot size for accommodation of the facility...
Adler Thermal Power Plant
28.11.2014 |

Adler Thermal Power Plant

Adler Thermal Power Plant (TPP) based on 2 energy power units PGU-180Т is meant to provide the Olympic objects located in Imeritinskyi lowland and developing facilities of Sochi as a mountain resourt with thermal and electric energy. General Information about the Object: The land lot for construction of Adler Thermal...
Neftegorsky Gas Processing Plant
27.11.2014 |

Neftegorsky Gas Processing Plant

Neftegorsky Gas Processing Plant is to be equipped with SMES*. The designed object of capital construction is Neftegorsky gas processing plant. It was designed to receive and process associated gas of the 1st separation stage of oil "Gorbatovsky», 1st, 2nd and 3rd stages of oil separation "Bogatovskneft" produced in the...
Figure Skating Centre after E. A. Chaikovskaya
27.11.2014 |

Figure Skating Centre after E. A. Chaikovskaya

SMES* equipment is to be installed in the Complex of capital sports facilities at the address: Moscow, Strogino area. Tallinnskaya street, bld. 40, at the intersection with the Marshal Katukova street. Complex of sports facilities consists of two blocks, united by a common architectural solution: - the 1st unit...
Stadium "Spartak", Moscow, Volokolamskoe highway, ow.67., JCSC
20.11.2014 |

Stadium "Spartak", Moscow, Volokolamskoe highway, ow.67., JCSC

Multifunctional complex of football Stadium "Spartak" in Moscow is located at bld .67, Volokolamskoe highway, Moscow. The structure of the stadium facilities includes: 1) Football field with artificial turf grass with modern drainage systems, heating and automatic irrigation system lawn is possible in order to install natural turf. The dimensions...
Small Ice Ice Hockey Arena in Sochi
20.11.2014 |

Small Ice Ice Hockey Arena in Sochi

«Small Ice Hockey Arena in Sochi»: capacilty is 7,000 seats, prefabricated structure, Imeretinskaya lowland (engineering design and survey works, construction), Sochi, Adler region, Imeretinskaya lowland. Main technical characteristics: Capacilty – 7 000 seats; Construction area – 9 710 м²; Total building area – 22 870 м²; COnstruction volume – 231...
Multifunctional Complex (MIBC "Moscow-city", plot No. 16 a and plot No. 16,"B")
20.11.2014 |

Multifunctional Complex (MIBC "Moscow-city", plot No. 16 a and plot No. 16,"B")

Multifunctional complex on the land plot at Krasnopresnenskaya embankment, "Moscow-City", plot №16 «A» and a plot №16 »B», JSC Central", Moscow. Office and administrative building: Number of floors: 45 (44 underground) Height: 215 m Apartment building: Number of floors: 87 (86 above-ground) Height: 330 m Total area: 249,600 sqm Office...
Multifunctional Business center, Moscow, Novodanilovskaya quay, 6.
20.11.2014 |

Multifunctional Business center, Moscow, Novodanilovskaya quay, 6.

Multifunctional Business center, Moscow, Novodanilovskaya quay, 6. Administrative office / business complex: land area of 0.53 hectares building area of 2193 square meters the total area of 39385 square meters underground area 9539 sq.m. The total area of the aerial part - 29 846 sq.m, including: Building A - 16068...
Integrated Duty Dispatching Center in Krasnoyarsk City
20.11.2014 |

Integrated Duty Dispatching Center in Krasnoyarsk City

Integrated Duty Dispatching Center in Krasnoyarsk City is located at 68, Mira street, Krasnoyarsk. Center for receiving messages of SMES* operates as a part of an Integrated Duty and Dispatching Center of the city. It is designed for preventing and managing emergencies, fires at the facilities of the Krasnoyarsk Territory...