Yakutskaya State District Power Plant-2
23.01.2017 |

Yakutskaya State District Power Plant-2

Engineering Center "BASIS" perfomed the following works for the facility "Yakutskaya State District Power Plant-2":- - SMES working documents development,- Delivery of equipment,- Construction and erection works. Customer: АО "TEC Mosenergo" The station supplies electricity in 9 districts of the Central energy district of Yakutia, providing customers with generate power...
Power Unit PGU-420Т TPS-20 - subsidiary of PAO «Mosenergo»
19.01.2017 |

Power Unit PGU-420Т TPS-20 - subsidiary of PAO «Mosenergo»

Engineering Center «BASIS» performed the following works on SMES* of the facility Power Unit PGU-420Т TPS-20 - subsidiary of PAO «Mosenergo»: - SMES working documents development; - delivery of equipment and materials; - construction and erection works; - commissioning works. Customer: "TEC Mosenergo" Power Unit PGU-420Т is located in the...
Construction of a Power-Generating Unit PGU of 220 tons, at Thermal Power Plant-12
17.12.2014 |

Construction of a Power-Generating Unit PGU of 220 tons, at Thermal Power Plant-12

Engineering Center GOCHS "BASIS" carried out the following works on SMES* of the facility "Power-Generating Unit PGU of 220 tons, at Thermal Power Plant-12": - SMES engineering design and working documents development;- supply of equipment and materials,- construction and installation,- commissioning works. Customer: АО "ТEC Mosenergo". PGU-220T provides a combined...
Construction of a Power-Generating Unit PGU of 420 tons, at Thermal Power Plant-16
17.12.2014 |

Construction of a Power-Generating Unit PGU of 420 tons, at Thermal Power Plant-16

Engineering Center GOCHS "BASIS" carried out the following works on SMES of the facility "ower-Generating Unit PGU of 420 tons, at Thermal Power Plant-16": - SMES engineering design and working documents; - supply of equipment and materials; - construction and erection works; - commissioning works. Customer: АО "TEC Mosenergo" Power-generating...
The Territory of Serov State District Power Station. Сonstruction of Power Generation Unit PGU-420 with Release of the First Starting Complex - Art. No. 9, 10.
11.12.2014 |

The Territory of Serov State District Power Station. Сonstruction of Power Generation Unit PGU-420 with Release of the First Starting Complex - Art. No. 9, 10.

Engineering Center GOChS "BASIS" performed the following works on SMES* of the facility "Serov State District Power Station. Сonstruction of Power Generation Unit PGU-420 with Release of the First Starting Complex - Art. No. 9,10" : - Development of SMES working documents;- Delivery of equipment and materials; - Construction and...
Power Unit №4 of Cherepovets State District Power Station based combined-cycle technology, Block №4 (PGU-420)
10.12.2014 |

Power Unit №4 of Cherepovets State District Power Station based combined-cycle technology, Block №4 (PGU-420)

Automatic unit process control system and other equipment, communication devices providing regular work of the installation should be based on «SPPA-T3000» (SIEMENS AG). Construction of PGU-400 MW is planned to be done on the free territory of the reserve branch of "OGK-6" of Cherepovets State District Power Station industrial site...
Enrichment Plant "Matyushinskaya", LLC "Cut" Berezovsky "
08.12.2014 |

Enrichment Plant "Matyushinskaya", LLC "Cut" Berezovsky "

ИЦ ГОЧС «БАЗИС» для объекта "Обогатительная фабрика "Матюшинская" ООО "Разрез «Березовский" выполнил следующие виды работ: поставку и пуско-наладку ПТК СМИС/СМИК Заказчик: ЗАО НИПИ "Кузбасспроект" Площадка для размещения фабрики расположена в Прокопьевском районе Кемеровской области. На обогатительной фабрике происходит обогащение коксующихся углей марок «ОС» и «КС» и энергетических углей марок «Т...
Abakan Thermal Power Station
08.12.2014 |

Abakan Thermal Power Station

A new Power Unit of Abakan Thermal Power Station is going to be equipped with SMES* System. The area of the construction site is 963,372 sq.m. Buildings and facilities that make up the project: "New Unit of Abakan TPS": the main building from the side of temporary end of the...
Adler Thermal Power Plant
28.11.2014 |

Adler Thermal Power Plant

Adler Thermal Power Plant (TPP) based on 2 energy power units PGU-180Т is meant to provide the Olympic objects located in Imeritinskyi lowland and developing facilities of Sochi as a mountain resourt with thermal and electric energy. General Information about the Object: The land lot for construction of Adler Thermal...
Neftegorsky Gas Processing Plant
27.11.2014 |

Neftegorsky Gas Processing Plant

Neftegorsky Gas Processing Plant is to be equipped with SMES*. The designed object of capital construction is Neftegorsky gas processing plant. It was designed to receive and process associated gas of the 1st separation stage of oil "Gorbatovsky», 1st, 2nd and 3rd stages of oil separation "Bogatovskneft" produced in the...