Engineering center
GOChS «BASIS»
05.09.2024

The development of design documentation for the SMIS for the project: "Construction of the Krasnogorsk water-lifting hydroelectric complex on the Irtysh River" has been completed.

On August 21, 2024, specialists from ZAO IC GOChS "BASIS" developed design documentation for a structured monitoring and control system for engineering systems of buildings and structures (SMIS) for the facility: "Construction of the Krasnogorsk water-lifting hydroelectric complex on the Irtysh River. Completion of construction (stage 2 of construction)"

The Krasnogorsk hydroelectric complex is a hydroelectric complex under construction on the Irtysh River, 1,813 kilometers from the mouth. It is located near the village of Krasnaya Gorka, Omsk District, Omsk Region. The hydroelectric complex is designed to regulate the water level in the Irtysh River within the city of Omsk and solve the expected problem of water shortages in the future.

At the second stage of the dam construction, it is planned to create a reservoir 65 kilometers long and put the hydroelectric complex into operation in 2027.

Photo: http://omskregion.info/