Engineering Center GOCHS "BASIS" works on engineering design of SMES* for construction sites at Customer' request.

In project documentation, "SMES" section should be developed as a part of section "The list of civil defense measures for preventing natural and man-made disasters".

Subsection "SMES" should be developed based on:

  • Technical specifications for creating SMES for a facility ;
  • Technical project for SMES of the facility;
  • Technical specifications for congugating SMES of the facility with IDC of the city received in the Main Department of the regional Emergency Committee.

Special Technical Conditions (STC)

In the STC additional requirements that are absent in the existing regulatory framework are submitted, They ensure development of:

  • Technical assignment for SMES project design;
  • Design solutions at SMES "Project" and "Working documentation" stages;
  • SMES putting-into-operation activities;
  • SMES maintenance activities.

STC provides including the following subsystems into the structure of SMES of the facility:

  • Communication and Crisis Management for the period of incidents, accidents, criminal and terrorist acts prevention;
  • System of monitoring engineering (bearing) structuress (BSCS).

STC must be approved by the Contractor, agreed with the customer and submitted for approval to the Customer General in accordance with the requirements for coordination and approval of technical specifications. (GOST 2.114-95 "Unified system for engineering design documentation. Specification.")

Terms of Reference

Specification for SMES design is developed in accordance with GOST 34.602-89, on the basis of the task to develop SMES agreed by the competent authority and approved by Ministry of Emergency Situations of Russia Customer. It defines the scope of design work on the SMES "Project" stage and requirements.

Technical Terms

SMES specifications of conjugation of SMES pf the facility with IDC of the city should be obtained in a regional Main Directorate of Ministry of Emergency Situations of Russia. Specifications are attached to SMES draft project.

Project

SMES Project as a part of project design documentation of the facility consists of the following parts:

  • Subsection 1: Subsystem of monitoring and control of a structured system for control and monitoring engineering systems;
  • Subsection 2: Subsystem of communications and management in crisis situations;
  • Subsection 3: Subsystem of monitoring engineering (bearing) structures (BSCS).

Design work at the stage of developing SMES "Project" and "Working documentation" are carried out in accordance with the original documentation provided by the Customer, which includes the following materials on engineering systems "Architectural solutions", "Design and space-planning decisions" and others.

SMES "Working documents" syage is performed based on the design documentation of SMES "Project" stage, as agreed by the State Expertise.

In the developing working documents "Engineering Center GOChS "BASIS" uses patent №86763 «Monitoring and control of engineering systems of buildings and facilities (SMES)."

Working drawings are developed in accordance with applicable rules, regulations and standards: ASAP, ESKD, GOST 34.201-89, 21.101-97 GOST.

The structure and content of SMES subsection of engineering design documentation stage "Project" carried out in accordance with the requirements of GOST 21.101-97, 34.201-89 GOST, GOST 34.601-90, RD 50-34.698-90.

The structure and content of SMES subsection of engineering design documentation stage "Working documentation" are performed in accordance with the requirements of GOST 21.101-97, 21.408-93 GOST, GOST 34.201-89, 34.601-90 GOST, RD 50-34.698-90.

Typical structure of SMES subsection of "Project" and "Working documentation" stages are presented in the Annexes to SMES Special Technical Requirements.

SMES subsection of "Project" stage is held as part of the State Expertise in case SMES Special Technical Requirements are developed and approved.

For SMES acceptance at "Working documentation" stage, a special program and testing methodology should be developed (it is not included into design and operation documents).

___________________________________________

* SMES - System of Monitoring Engineering Systems